I'm making decent progress with my Ravellenics project (WIP Dancing!) It helped that I was sick for two days during the week, so I got caught up with my knitting a little bit.
The sleeve is about 70% done. I have 1.5 more cable repeats and then to do 3 inches of saddle for the sleeve. (Each cable repeat is about 3 inches).
No comments:
Post a Comment